Permit/Application Details
Information for Permit #: SHL26-0003
| Project Name: | |
|---|---|
| Jurisdiction: | Auburn |
| Type: | SHORELINES |
| Address: | 601 ORAVETZ RD SE |
| Parcel: | 6655000024 |
| Status: | APPROVED |
|---|---|
| Applied Date: | 2/19/2026 |
| Application Expiration: | |
| Issued Date: | 5/7/2026 |
| Finaled Date: | 5/21/2026 |
| Permit Expiration: |
Description
WHITE RIVER EMERGENCY HESCOS AND SEEPAGE BLANKET
Three emergency flood fighting actions along the White River. First, approximately 540' of seepage blanket was placed along the landward side of the Oravetz School revetment to reduce potential for levee failure. Second, additional HESCOs were placed within Roegner Park (385' of double stack, 180' of single stack) and along the White River Trail (450' of single stack), to replace portions of the existing HESCOs in Roegner Park and prevent overbank flooding. Third, an additional 200' of single stack HESCOs is being placed at the upstream end of the existing HESCO alignment on the right bank along the A Street Trailer Court revetment to reduce risk of flanking, and 100' of double stack HESCOs is being replaced at the downstream end.