[{"ActivityDescription":"First Review-L.U.","DoneBy":"Laurie Tyler - (425) 452-2728","ActivityDate":"12/22/2021","ActivityStatus":"Review Pending","RecordDate":"","ActivityNotes":"Waiting for LP/LD approval"},{"ActivityDescription":"Rev. 1 Review-L.U.","DoneBy":"Laurie Tyler - (425) 452-2728","ActivityDate":"2/24/2022","ActivityStatus":"Review Pending","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 3 Review-L.U.","DoneBy":"Laurie Tyler - (425) 452-2728","ActivityDate":"5/1/2023","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 4 Review-L.U.","DoneBy":"Laurie Tyler - (425) 452-2728","ActivityDate":"1/30/2024","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":"These easement and coordination with adjacent property owner review items are not required for land use approval.  "},{"ActivityDescription":"Rev. 5 Review-L.U.","DoneBy":"James Harris - (425) 452-5278","ActivityDate":"8/15/2024","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 6 Review-L.U.","DoneBy":"James Harris - (425) 452-5278","ActivityDate":"12/2/2025","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Post Rev. 1 Review-L.U.","DoneBy":"James Harris - (425) 452-5278","ActivityDate":"1/15/2026","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Post Rev. 2 Review-L.U.","DoneBy":"James Harris - (425) 452-5278","ActivityDate":"1/22/2026","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"First Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"2/7/2022","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 1 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"3/14/2022","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":"3/14/22\r\n\r\nClearing \u0026 Grading Comments\r\n(Staff contact: Savina Uzunow, (425) 452-7860; suzunow@bellevuewa.gov)\r\n\r\n1. The drawings and the CSWPPP are approvable for Clearing and Grading\r\n\r\n2. An abatement security device is required for all projects that involve more than 5,000 square feet of clearing and/or more than 50 cubic yards of excavation and/or fill.  The amount of the security will be determined based upon an estimated construction cost for erosion and sedimentation control measures.  An estimate form for the Erosion Control Abatement Security can be obtained at: http://www.cityofbellevue.org/pdf/PCD/CG_Erosion_Control_Estimate_Form.pdf . Please complete the estimate and return it with the revised plans. The Abatement Security must be initiated prior to picking up the clearing \u0026 grading permit.  Currently, the acceptable forms for abatement security device include assignment of savings, performance and guarantee bond\r\n\r\n\r\n"},{"ActivityDescription":"Rev. 2 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"4/29/2022","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 3 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"9/7/2022","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 4 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"3/27/2024","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 5 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"8/26/2024","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 6 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"12/17/2025","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Post Rev. 1 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"1/16/2026","ActivityStatus":"Closed","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Post Rev. 2 Review-C\u0026G","DoneBy":"Savina Uzunow - (425) 452-7860","ActivityDate":"1/22/2026","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"First Review-Util","DoneBy":"Mohamed Sambou","ActivityDate":"2/2/2022","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":"LD must be issued. See note below as well.\r\n\r\nI took a look at the Onni early clear and grade permit. The project is still in the LD stage, but I see a potential timeline issue I wanted to raise now. I see that the clear and grading limits are beyond the location of an existing fire hydrant. The fire hydrant will likely need to be in service throughout construction. You will want to verify that with the fire department. I will need to see a plan for how the hydrant will remain in service or if the hydrant must be moved early. I want to warn now that if the hydrant is planned to be moved out of the construction limits, a UE may be needed early which can affect the timeline of the early clear and grade permit."},{"ActivityDescription":"Rev. 1 Review-Util","DoneBy":"Mohamed Sambou","ActivityDate":"3/2/2022","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 4 Review-Util","DoneBy":"Mark Dewey - (425) 452-6179","ActivityDate":"11/27/2023","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 5 Review-Util","DoneBy":"Mark Dewey - (425) 452-6179","ActivityDate":"8/15/2024","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Rev. 6 Review-Util","DoneBy":"Mark Dewey - (425) 452-6179","ActivityDate":"12/3/2025","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Post Rev. 1 Review-Util","DoneBy":"Mark Dewey - (425) 452-6179","ActivityDate":"1/21/2026","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"Post Rev. 2 Review-Util","DoneBy":"Mark Dewey - (425) 452-6179","ActivityDate":"1/21/2026","ActivityStatus":"No Concern Revision","RecordDate":"","ActivityNotes":null},{"ActivityDescription":"First Review-Trans","DoneBy":"Ryan K. Miller","ActivityDate":"8/17/2022","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":"Waiting for LD approval."},{"ActivityDescription":"Rev. 1 Review-Trans","DoneBy":"Ryan K. Miller","ActivityDate":"2/23/2023","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":"Waiting for LD approval."},{"ActivityDescription":"Rev. 4 Review-Trans","DoneBy":"Tyler Moore","ActivityDate":"1/26/2024","ActivityStatus":"Rev Requested","RecordDate":"","ActivityNotes":"Sent email to applicant on 01/26/2024"},{"ActivityDescription":"Rev. 5 Review-Trans","DoneBy":"David Irwin - (425) 452-4397","ActivityDate":"8/28/2024","ActivityStatus":"Review Pending","RecordDate":"","ActivityNotes":"Based upon the LJ (24-113252 LJ), the development proposal is changing significantly with respect to the square footage and ITE land use codes. An acceptable trip generation narrative has not been submitted as of the date of this comment. In addition, it\u0027s not clear whether other aspects of the building and site are changing since the LJ permit has not been resubmitted. Based on this, the transportation review line is being closed until such time that additional information is submitted under the LJ permit to continue transportation review of the BD and GD permits (21-134212 BV and 21-133872 GD). (-DI 08.28.2024)"},{"ActivityDescription":"Rev. 6 Review-Trans","DoneBy":"David Irwin - (425) 452-4397","ActivityDate":"12/16/2025","ActivityStatus":"Approved","RecordDate":"","ActivityNotes":"This is for early grading only. A right-of-way use permit is needed for the work in the ROW. The full on-site grading has not been approved at this time. (-DI 12.16.2025)"},{"ActivityDescription":"Post Rev. 1 Review-Trans","DoneBy":"David Irwin - (425) 452-4397","ActivityDate":"1/16/2026","ActivityStatus":"Closed","RecordDate":"","ActivityNotes":"Incorrect information on the plans per the permit techs. Review line is being closed without review, as directed by Kirstin Wilson. (-DI 1.16.2026)"},{"ActivityDescription":"Post Rev. 2 Review-Trans","DoneBy":"David Irwin - (425) 452-4397","ActivityDate":"2/3/2026","ActivityStatus":"Closed","RecordDate":"","ActivityNotes":"Utility relocations are on private property on the east side of the site. That being said, this post revision is not applicable to transportation review. (-DI 02/03/2026)"}]