[{"Description":"900 ROW-Jobstart","Date":"7/22/2026","Status":"Ongoing","Staff":"Robert Dobbs","Notes":"Made site visits, no crew, called and spoke to Carlos with Cannon, crew has not arrived on site, 2pm.\n3pm road restriction, Carlos said he will be tabling the splice case audit with no impact to traffic on the east side of 106th. TCS and flaggers on site to maintain pedestrian access.","DocumentUrl":null,"DocumentName":null},{"Description":"902 ROW-Precon","Date":"7/16/2026","Status":"Ongoing","Staff":"Robert Dobbs","Notes":"Phone pre-con Austin Sweeny with Cannon, crew proposing to access 2 vaults and relocate a splice case, no surface disturbance anticipated. TCS and 2 flaggers to set up traffic control per approved plan. I let Austin know that the arts fair set up is on the 23rd, crew can work Monday Tuesday Wednesday or after the event. Flaggers to maintain pedestrian access. Austin to reach out to Metro as one of the vault locations is at the Metro layover locations.","DocumentUrl":null,"DocumentName":null},{"Description":"902 ROW-Precon","Date":"9/2/2026","Status":"Ongoing","Staff":"Robert Dobbs","Notes":"Phone pre-con with Alex from Cannon for night work, crew to access 2 existing vaults and relocate an existing splice case. TCS and flagger to set up traffic control per approved plan and maintain pedestrian access. Crew to start work at 9pm to 5am, night work notification to be sent out.","DocumentUrl":null,"DocumentName":null}]