Type: Public Works, Class: Franchise Utility/Telecom ROW
FRONTIER TO BORE (1)2" CONDUIT FROM POLE 4 AT NE 90TH ST, go east to 122nd Ave NE, then SOUTH ALONG THE WEST SIDE OF 122ND AVE NE TO THE NORTH-EAST CORNER OF 12006 NE 85TH ST WHERE THERE IS AN EXISTING 2X5 HAND-HOLE. BORE PATHWAY WILL REQUIRE SMALL SIDEWALK PANEL REMOVAL AT POLE ON NE 90TH ST AND MAY REQUIRE (1)PANEL REMOVAL AT PED 5760 AND PLACEMENT OF (1)2X3 HAND-HOLE IN THE PLANTER STRIP. ASPHALT REMOVAL AT THE 2X5 HAND-HOLE IS NOT IN ROADWAY BUT IN DRIVEWAY TO LOADING DOCKS. BORE SETUP AT SOUTH END AND BORE NORTH TO POLE TO AVOID TRAFFIC IMPACTS ON NE 90TH ST. FRONTIER TO PLACE FIBER OPTIC CABLE IN NEW PATHWAY FROM POLE KRLDWAXX 4 TO 12006 NE 85TH ST FOR NEW SERVICES. Also, SPLICING ON 124TH AVE NE AT NE 92ND ST ALSO REQUIRED. TRAFFIC CONTROL REQUIRED AT THIS LOCATION FOR MAN-HOLE ACCESS.