Please note that any Over-the-Counter (OTC) permit applications left in your cart or saved as drafts in your MBP Dashboard will be automatically removed on December 31, 2026. What this means for you:

  • OTC applications must be submitted before December 31 to avoid losing your work.
  • Applications that require plan review will not be affected and will remain in your Drafts.

We recommend reviewing your dashboard and submitting any in-progress OTC applications as soon as possible. Thank you!

Coming Soon! The eCityGov Alliance is excited to welcome the City of Shoreline to the MyBuildingPermit (MBP) portal in January 2027. This milestone expands access to the Alliance's regional online permitting platform, making it easier for customers to submit and track permit applications.

Permit/Application Details

Information for Permit #: DEV23-0003

Project Name:
Jurisdiction: Auburn
Type: DEVIATION
Address: 839 21ST ST SE
Parcel: 1921059192
Status: APPROVED
Applied Date: 1/6/2023
Application Expiration:
Issued Date:
Finaled Date:
Permit Expiration:

Description

OLYMPIC MIDDLE SCHOOL ATHLETIC FIELDS
The project will construct a new planter strip and sidewalk along the west side of K St SE. There is an existing gas line located below the proposed planter strip location, and other utilities at the back of walk in this area leave few options for relocating the gas main. City of Auburn Engineering Design Standards Section 10.09.02 requires trees to be planted in the planter strip. The presence of the gas line means that this is not possible. Additionally, the sewer line and underground power at the back of walk prevents us from planting trees between the sidewalk and new track. We propose to instead add a tall evergreen shrub, such as Arthur Menzies Mahonia, to the landscape buffer along the track to provide additional plant height and screening between the track and K St SE.

  See Permit or Approved Plans for Conditions