Please note that any Over-the-Counter (OTC) permit applications left in your cart or saved as drafts in your MBP Dashboard will be automatically removed on December 31, 2026. What this means for you:

  • OTC applications must be submitted before December 31 to avoid losing your work.
  • Applications that require plan review will not be affected and will remain in your Drafts.

We recommend reviewing your dashboard and submitting any in-progress OTC applications as soon as possible. Thank you!

Coming Soon! The eCityGov Alliance is excited to welcome the City of Shoreline to the MyBuildingPermit (MBP) portal in January 2027. This milestone expands access to the Alliance's regional online permitting platform, making it easier for customers to submit and track permit applications.

Permit/Application Details

Information for Permit #: BNR20-01921

Project Name:
Jurisdiction: kirkland
Type: BNR
Address: 12033 NE 80TH ST
Parcel: 092505-9012
Status: Finaled
Applied Date: 3/18/2020
Application Expiration:
Issued Date: 7/14/2020
Finaled Date: 2/22/2022
Permit Expiration: 1/14/2024

Description

Type: Building Non-Residential, Class: Addition to Structure

LWHS - ALTERATION AND ADDITION TO BUILDING III. THE SCHOOL WILL REMAIN OPERATIONAL THROUGHOUT THE CONSTRUCTION PHASE. PROJECTED STUDENT POPULATION IS NOT PROPOSED TO INCREASE WHEN PROJECT COMPLETES. SITE PREPARATION INCLUDES DEMOLITION OF EXISTING PAVING AND LANDSCAPING, RELOCATION AND EXTENSION OF UNDERGROUND UTILITIES, ADDED STORM WATER DETENTION, SITE HYDRONIC PIPING, SITE LIGHTING REVISIONS, NEW PAVING AND LANDSCAPING, NEW SITE FENCING ALONG THE EAST AND WEST COURTYARDS, AND ADDITION OF A SECURE PEDESTRIAN WALKWAY BETWEEN COMMONS AND GYM. ALTERATION WORK WILL TAKE PLACE IN THE AUXILIARY GYMNASIUM AS ADDITIVE ALTERNATE SCOPE. WORK WILL INCLUDE EXPANDING THE EXISTING LOCKER ROOM CAPACITY. ADDITION WORK WILL CONSIST OF CONSTRUCTING APPROXIMATELY 20,000 SF OF NEW AREA NORTH OF THE EXISTING GYM. THE NEW ADDITION INCLUDES A GYMNASIUM, RESTROOMS, AND STORAGE. THE STRUCTURAL SYSTEM IS STEEL COLUMNS, BEAMS AND ROOF JOISTS; METAL STUD WALL FRAMING; AND CONCRETE SLAB ON GRADE. EXTERIOR MATERIALS ARE BRICK VENEER, ALUMINUM STOREFRONT GLAZING, AND CURTAINWALL FRAMING WITH INSULATED METAL PANEL INFILL. SOME EXISTING PARKING WILL BE DEMOLISHED FOR THE NEW CONSTRUCTION, AND NEW PARKING WILL BE ADDED IN PLACE OF THE PORTABLES. REMOVAL AND REPLACEMENT OF PARKING STALLS HAS BEEN REVIEWED AND APPROVED UNDER A PREVIOUS MASTER PLAN SUBMITTAL (ZON18-00783). See LSM20-01021 for grading and underground utilities.

PROJECT: LWHS - 2019 MASTER PLAN (CLASSROOM/GYM/COMMONS ADDITIONS)

  See Permit or Approved Plans for Conditions