DOUGLAS HERRERA AGUIRRE SFR- EXTERIOR- INSTALL NEW SHEATHING AND NEW SIDING. MAIN FLOOR- REMOVE FIREPLACE AND REMOVE NON BEARING WALL TO CREATE OPEN SPACE FROM KITCHEN TO LIVING. COMBINE (2) BATHROOMS TO CREATE MASTER BATH. REMOVE HALL CLOSET TO ENLARGE BEDROOM CLOSET. RELOCATE AND REPLACE WINDOWS.
BASEMENT-FINISH UNHEATED BASEMENT BY REMOVNG NON BEARING WALLS AND CREATE (2) BEDROOMS, BATHROOM AND FAMILY ROOM. INSTALL NEW BATH WHERE EXISTING PLUMING ALREADY EXISTED. REMOVE EXTERIOR COVERED PATIO AREA IN ORDER TO RELOCATE SLIDING GLASS DOOR AND NEW LEVEL LANDING. REPLACE WINDOWS. THE BASEMENT HAS NO KITCHEN IS NOT APPROVED TO BE USED AS A SEPERATE DWELLING UNIT. MAIN FLOOR AND BASEMENT MUST BE ATMOSPHERICALLY CONNECTED. OWNER ACTING AS CONTRACTOR.