Permit/Application Details
Information for Permit #: 25 127616 GD
| Project Name: | COBU - 2026 Phase 3 Water Main Replacements |
|---|---|
| Jurisdiction: | BELLEVUE |
| Type: | GD |
| Address: | 450 110th Ave NE |
| Parcel: | 3225059199 |
| Status: | Pending |
|---|---|
| Applied Date: | 12/1/2025 |
| Application Expiration: | |
| Issued Date: | |
| Finaled Date: | |
| Permit Expiration: |
Description
The City of Bellevue will be installing approximately 2,720 linear feet of replacement ductile iron water mains, fire hydrants, water services and water system appurtenances and abandon in place of the existing AC water main. The Work includes excavation of approximately 1,400 cubic yards (bank) and the placement of 1,300 cubic yards (bank) of new trench backfill (mostly crushed rock and asphalt). Streets will be kept clean during construction. A street sweeper will be used as needed. It is expected that excavated material will be removed from the construction sites during the initial excavation. Any excavated materials that are to be kept on sites more than 48 hours by the contractor will be covered. All downstream catch basins will be fitted with sediment inserts prior to beginning excavation. Work is predominantly within the public right of way or along private roadways with some watermain installation across developed landscape on private property.