Post Revision # 17: Install temporary poles for overhead utility temporary relocation along SE Eastgate Way and trimming of existing trees for the temporary overhead. The locations of the temporary poles shall meet COB current Transportation Design Manual .
Post Revision # 14: 142nd East HOV Ramps Closure & Detour for maintenance on light poles.
Post Revision # 12: Utilize an approved TCP for the SE 36th St for girder set South half of bridge on 6/12 & 6/13 (10pm - 5am).
Post Revision # 10: Stage 3, Close 142nd Pl SE on ramp to WB I-90.
Post Revision # 9: Night closure of SE 36th St. for girder erection of Sunset Creek structure.
Post Revision # 7: SE 36th St. closure from Nov. 17th 10:00 PM to Monday Nov. 20th 5:00 AM for the installation new passable structure for Sunset Creek.
**REV 5 - MOT Stage 2 (TC120-125). tjs 05/24/23 **REV 4 - TCP's TC100-116. tjs 05/16/23 **This initial work is for an exploratory geotechnical boring that we need to finalize the design for the bridge foundation that will replace the fill and existing culvert pipe used to carry Sunset Creek. This pipe has been determined to be a fish barrier and this project will remove it and establish a stream bed for Sunset Creek. This will be accomplished by using top down construction to replace the existing roadway with bridges and then excavating below and constructing retaining walls. This same plan includes SE 36th St, Eastgate Way and I-90. For this permit only the work on SE 36th is being included and it is one sampling location.