Please note that any Over-the-Counter (OTC) permit applications left in your cart or saved as drafts in your MBP Dashboard will be automatically removed on December 31, 2026. What this means for you:
- OTC applications must be submitted before December 31 to avoid losing your work.
- Applications that require plan review will not be affected and will remain in your Drafts.
We recommend reviewing your dashboard and submitting any in-progress OTC applications as soon as possible. Thank you!
Permit/Application Details
Information for Permit #: 20 119904 LJ
| Project Name: | Holden of Bellevue |
|---|---|
| Jurisdiction: | BELLEVUE |
| Type: | LJ |
| Address: | 121 112th Ave NE |
| Parcel: | 3225059232 |
| Status: | Closed |
|---|---|
| Applied Date: | 10/22/2020 |
| Application Expiration: | |
| Issued Date: | 4/21/2021 |
| Finaled Date: | 4/26/2021 |
| Permit Expiration: | 4/21/2023 |
Description
Alliance Residential will be developing the parcel to the south of the Holden of Bellevue project at 121 112th Avenue NE. The new project to the south will revise grades at the property line and provide an alternative through-block connection which leads to the through-block connector stairs and accessible lift provided on the Holden of Bellevue site. We are proposing a modification to our drawings to accommodate this new connection, removing the through block connector on our site that leads to the stairs. This area would be converted into a private courtyard for residents.