Permit/Application Details

Information for Permit #: 20 113519 GD

Project Name: ERC Regional Trail NE 8th Street Crossing
Jurisdiction: Bellevue
Type: GD
Address: 11660 NE 8th St
Parcel: 1099100496
Status: Closed
Applied Date: 8/26/2020
Application Expiration:
Issued Date: 11/30/2021
Finaled Date: 6/28/2024
Permit Expiration: 5/28/2025

Description

The NE 8th Street Crossing project will construct a grade-separated crossing for the Eastside Rail Corridor Regional Trail over the major arterial. It is located along the Wilburton Segment of the Eastside Rail Corridor at its intersection with NE 8th Street in Bellevue, Washington. NE 8th Street is a high volume, seven-lane east-west arterial connecting downtown, Interstate 405, the Wilburton Commercial Area, and northeast Bellevue. The purpose of the elevated crossing is to provide a safe non-motorized, multi-use trail connection between the north and south at-grade legs of the Eastside Rail Corridor, the Sound Transit Wilburton Station, and sidewalks along both sides of NE 8th Street. The structure will consist of prefabricated trusses supported by single column piers founded on drilled shafts. The structure is comprised of six spans, a 168-foot main span, three south approach spans and two north approach spans. Approach spans range from 70 to 80 feet. The bridge abutments are spread footings supported on structural earth walls. The project will also construct a companion ramp and stairs to the south of NE 8th Street, stairs to the north of NE 8th Street, a connection to the north entrance of the Wilburton Station, and associated drainage and street frontage improvements.

  See Permit or Approved Plans for Conditions