Please note that any Over-the-Counter (OTC) permit applications left in your cart or saved as drafts in your MBP Dashboard will be automatically removed on December 31, 2026. What this means for you:
- OTC applications must be submitted before December 31 to avoid losing your work.
- Applications that require plan review will not be affected and will remain in your Drafts.
We recommend reviewing your dashboard and submitting any in-progress OTC applications as soon as possible. Thank you!
Permit/Application Details
Information for Permit #: 20 111242 BM
| Project Name: | Interlake HS Kitchen Modernization |
|---|---|
| Jurisdiction: | BELLEVUE |
| Type: | BM |
| Address: | 16245 NE 24th St |
| Parcel: | 2625059001 |
| Status: | Closed |
|---|---|
| Applied Date: | 7/8/2020 |
| Application Expiration: | |
| Issued Date: | 10/20/2020 |
| Finaled Date: | 7/29/2021 |
| Permit Expiration: | 10/20/2023 |
Description
The project consists of a new addition and interior renovation of the kitchen of Interlake High School. The project will be completed in two phases. Phase 1 consists of the construction of the new addition including the new fire water main and revision of existing fire sprinkler riser system without interruption of system operations, relocation of the gas meter, installation of a new sewer line while existing line is in operation, construction of a temporary wall to separate construction from existing kitchen to remain in operation, selective demolition of interior spaces and exterior siding, construction of new kitchen, utilities, and earthwork. Phase 2 will consist of demolition of the existing kitchen and tenant improvments of the food court/existing hallway and existing lobby including the following, demolition of existing kitchen and accessory spaces, construction of new food service area and snack bar, tenant improvement of food court and lobby areas, removal of temporary construction wall.