Please note that any Over-the-Counter (OTC) permit applications left in your cart or saved as drafts in your MBP Dashboard will be automatically removed on December 31, 2026. What this means for you:

  • OTC applications must be submitted before December 31 to avoid losing your work.
  • Applications that require plan review will not be affected and will remain in your Drafts.

We recommend reviewing your dashboard and submitting any in-progress OTC applications as soon as possible. Thank you!

Coming Soon! The eCityGov Alliance is excited to welcome the City of Shoreline to the MyBuildingPermit (MBP) portal in January 2027. This milestone expands access to the Alliance's regional online permitting platform, making it easier for customers to submit and track permit applications.

Permit/Application Details

Information for Permit #: 18 126769 GD

Project Name: COBU AC Water Main Replacement, 2018 Phase 2
Jurisdiction: BELLEVUE
Type: GD
Address: 450 110th Ave NE
Parcel: 3225059199
Status: Canceled
Applied Date: 10/3/2018
Application Expiration:
Issued Date:
Finaled Date: 10/9/2018
Permit Expiration:

Description

Install replacement ductile iron water mains, fire hydrants, water services and water system appurtenances and abandon in place the existing AC water main within the right of way on SE 8th St., between 143rd Pl SE & 148th Ave SE. The Work includes excavation of approximately 850 total cubic yards (bank) and the placement of 760 total cubic yards (bank) of new trench backfill (mostly crushed rock and asphalt). Streets to be kept clean during construction. Street sweeper to be used as needed. It is expected that excavated material will be removed from the construction sites during the initial excavation. Any excavated materials that are to be kept on sites more than 48 hours by the contractor will be covered. All downstream catch basins will be fitted with sediment inserts prior to beginning excavation.

  See Permit or Approved Plans for Conditions